Projects Undertaken

Feasibility & Technical Studies

Feasibility & Technical Studies

  • Completed Conceptual, PFS, and DFS across gold, iron ore, magnetite, and base metals.
  • Supported projects with CAPEX over ₹7,500 Cr / USD 1B.
  • Delivered LOM schedules for deposits with 10–500 Mt in reserves.
Mine Operations & Ramp-Up

Mine Operations & Ramp-Up

  • Operated sites producing up to 10,000 oz/month of gold and 30 Mtpa of ore.
  • Executed multiple cutbacks from study to production.
  • Led ramp-ups delivering 150% output growth in 6 months.
Pit Design & Optimisation

Pit Design & Optimisation

  • Achieved ₹90+ Cr cost savings through pit wall and waste optimisation.
  • Designed haulage systems for ore bodies up to 350m deep.
Environmental & Closure

Environmental & Closure

  • Managed TSFs with 5+ million m³ capacity and 1 Mt/year tailings circuits.
  • Developed closure strategies for 50+ hectares.